ZA0518 + ZP0521

Front ballast 5°-18 kg and rear ballast 5°-21 kg

ZA1021 + ZP1027

Front ballast 10°-21 kg and rear ballast 10°-27 kg

ZA1523 + ZP1532

Front ballast 15°-23 kg and rear ballast 15°-32 kg

Horizontal

Vertical

5° - 10° - 15°

ZA0518 + ZP0521

Front ballast 5°-18 kg and rear ballast 5°-21 kg

ZA1021 + ZP1027

Front ballast 10°-21 kg and rear ballast 10°-27 kg

ZA1523 + ZP1532

Front ballast 15°-23 kg and rear ballast 15°-32 kg

Horizontal

Vertical

5° - 10° - 15°

Approved by

B-DUE

Ballast system for large modules

The ballasts of the B-DUE system have M8 threaded bushings for the installation of the PRC14005Z spacer profile, which allows the perfect alignment of the blocks ensuring the coplanarity of the support planes and the proper functioning of the clamps, the rear block has an additional M8 threaded bushing for the installation of the bracing profile anchor collars, and both blocks, on the sides, have ø14 holes for the installation of the side collars with M8 dowels.
The B-DUE system includes a number of accessories to ensure proper installation and stability of the system.

Fill out the form

To get more information about the desired product

* required fields

Contact Italy at SMART ENERGY FORUM Prague 2024